Product Details
Structural Drawing of Constant Force Spring Support and Hanger
Parameters and Performance Indexes
- Standard Load: The load during operation of supports and suspended pipes during design.
- Cold Position (Blue Arrow): Position of the pipe in installation state.
- Hot Position (Red Arrow): Position of the pipe in working state.
- Displacement Direction: Upward "s", Downward "X".
Constancy & Load Deviation
Installation Guidelines
Installation and positioning are carried out according to displacement direction and working load. Markings include blue arrows for installation and red arrows for working load. Locate pins should be removed after hydraulic testing is qualified.
Frequently Asked Questions
1. Are you a factory or a trading company?
We are one of the largest heating furnace manufacturers in China, specializing in high-quality equipment.
2. Can we visit the factory before placing orders?
Yes, we warmly welcome all customers to visit our production facilities.
3. What information is needed for an inquiry?
Please provide working conditions, medium, temperature, pressure, material requirements, and dimensions.
4. What is the Minimum Order Quantity (MOQ)?
We accept loose quantity orders, trial orders, and mixed orders to suit your project needs.
5. How is quality control handled?
Quality is our priority. We perform strict testing before delivery and hold ISO9001 and ISO14001 certifications.
6. What is the standard warranty period for the equipment?
We provide a comprehensive one-year free warranty followed by life-long maintenance services.