3" Seismic Sway Bracing Pipe Hanger Clamp Double U-Bolt Pipe Clamp

Still deciding? Get samples of $ !
Order Sample

Product Description

📋

Basic Information

Connection
Coupling
Structure
Vertical
Flexible/Rigid
Flexible
Material
Alloy/Carbon Steel/Stainless Steel
Standard
Standard
Surface
Electro-Galvanized/Hot-DIP
Adaptive Domain
Sprinkler System/Piping Support/Fire Protection
Certificated
FM/UL/CE/ISO
Lead Time
15-20 Days
Model
Cushion/U-Type/Ring/Clevi
International Standard
ASTM / JIS / DIN / BS / GB/GOST
Capacity
50000/Month
📸

Detailed Photos

Pipe Hanger Clamp
📄

Product Description

Seismic supports can minimize the economic losses caused by earthquakes and prevent casualties, and their role cannot be underestimated. Seismic supports can protect waterways and power channels, prevent the collapse of other building facilities in the house, and ensure other hazards caused by earthquakes, thereby ensuring personal safety and reducing economic losses to a greater extent.

Double U-Bolt Pipe Clamp
Seismic Sway Bracing
📐

Technical Drawing & Installation

Draw Diagram
Place over the pipe to be braced, adjust brace angle, and insert bracing pipe through opening leaving a minimum of 1"(25.4) extending from attachment. Brace pipe can be installed on top or bottom of pipe to be braced but must be a minimum of 6"(152.4) away from a pipe joint. Tighten nuts down evenly until 30~35N·M to make all green making lines visible.
📊

Design Load Specifications

UL Maximum Design Load
Pipe Size lbs. kN Wt. Each (1" Brace)
1(25)6803.020.71 lb0.35 kg
2(50)6803.020.92 lb0.42 kg
4(100)6803.021.21 lb0.55 kg
6(150)13706.091.52 lb0.69 kg
8(219)13706.091.81 lb0.82 kg
FM Maximum Design Load
Pipe Size Horiz. Load (30°-44°) Horiz. Load (45°-59°) Wt. Each (1" Brace)
2(50)590 lbs2.62 kN840 lbs3.73 kN0.92 lb0.42 kg
4(100)540 lbs2.40 kN770 lbs3.42 kN1.21 lb0.55 kg
6(150)270 lbs1.20 kN390 lbs1.73 kN1.52 lb0.69 kg

Quality Control

QC 1
QC 2

Our production range includes various pipe fittings such as Steel Pipe Nipples, Couplings, Stainless Steel Threaded Fittings, and Malleable Iron Fittings adhering to DIN, British, and American standards. We ensure strict quality adherence through FM/UL certification and cooperation with third-party inspections.

🏗️

Application and Case

Application Case 1
Application Case 2
📦

Packaging & Shipping

Packaging 1
Packaging 2
Packaging 3
🔗

Related Products

Related Items

Frequently Asked Questions

Q1 What is the minimum quantity of the order?
Answer: The purchase volume of mixed products is 4 tons.
Q2 How long is the delivery time?
Answer: The delivery time for general orders is about 30 days. For urgent orders with stock, it is around 7 days.
Q3 What payment methods do you accept?
Answer: We accept payment terms such as TT, L/C, DP, Western Union, Paypal, etc.
Q4 Where is your departure port?
Answer: The port of departure is generally Tianjin Port or Qingdao Port. We can also deliver to designated warehouses in Yiwu or Guangzhou.
Q5 What certificates do your products have?
Answer: Our products have FM/UL certificates, and we cooperate with third-party inspections like SGS and TUV.
Q6 What are the packaging methods?
Answer: Packaging includes carton packaging, pallet packaging, wooden box packaging, and woven bag packaging.
Final View

Related Products