Premium Stainless Steel Saddle with Compression Ring for HDPE Pipe

Still deciding? Get samples of $ !
Order Sample

Product Description

📋 Basic Information
Connection
Female
Surface Treatment
Plated Copper
Head Type
Round
Pressure
Pn16
Raw Material
PE100
Specification
25*1/2"-110*1"
HS Code
3917400000
Features
Crack, Brittleness & Impact Resistance
Product Banner
⚙️ Product Description
HDPE Compression Saddle Clamp

Meet the HDPE Compression Saddle Clamp with Stainless Steel Reinforcing Ring for irrigation. Designed for secure irrigation connections, this fitting offers HDPE durability and corrosion resistance, with a stainless steel ring for added strength.

Install easily; fits various pipe sizes. This versatile clamp ensures leak-free, reliable connections in agriculture and landscaping. Enhance your irrigation with the HDPE Compression Saddle Clamp and Stainless Steel Reinforcing Ring.

HDPE Saddle Clamp Details HDPE Fitting Structure
🏗️ Pipeline System Solutions
Our main products include HDPE pipes, water supply pipes, electrofusion fittings, butt fusion fittings, PP-R pipes & fittings, and customized components. These products are widely used in municipal water supply, industrial fluid transportation, mining, and agriculture irrigation.
All products strictly comply with GB/T, ISO 4427, ISO 4437, EN, ASTM, and other international standards to ensure safety, durability, corrosion resistance, and ease of installation.
HDPE Product Showcase 1 HDPE Product Showcase 2
Technical Specifications Diagram
📦 Packaging & Delivery
Package Size
30.00cm * 30.00cm * 30.00cm
Gross Weight
1.000kg
Capacity
100,000 PCS Per Month
Transportation
Water Transportation
Production Facility Quality Control Storage Warehouse
Frequently Asked Questions
Are you a factory or a trading company?
We are factory direct sales, providing competitive pricing and direct quality control.
What are your payment terms?
We accept T/T (30% as deposit, the remaining 70% paid before delivery) and L/C at sight.
Where is your nearest loading port?
Our nearest loading port is Ningbo, China.
Do you have overseas warehouses?
Yes, we maintain an overseas warehouse located in Riyadh.
How long does it normally take for the product to be delivered?
Our typical production lead time is approximately 2 weeks.
Could you provide relevant samples?
Of course, we are more than willing to provide samples for quality verification.

Related Products