Durable Roller Head Small Pipe Support Adjustable Height 26-50

Customization: Available
Folded: Folded
Build Method: Upright Column

Product Description

📊 Basic Information
Model NO.
2# B
Feature
Recycled
Material
Metal
Type
Roller Stand
Style
Floor-type
Height Adjustment
26-50cm
Body Material
Premium Steel
G.W.
12kgs
Application
Pipe Support
Head
Roller Head
Color
Customized
OEM
Available
HS Code
7610900000
Capacity
50,000 pieces/Year
📝 Product Description
Pipe Support
  • Body is constructed of premium steel, which is resistant to rust and corrosion.
  • Adjustable Height: 26-50cm
  • The pipe stand can be folded up for easy transportation, storage and saving space.
  • Durable roller-head design for long-term use.
  • Wide application: suitable for holding different kinds of pipes.
📸 Detailed Photos
📏 Specifications
Model No. N.W. (kgs) Adjustable Height
B Pipe Stand 12 kgs 26cm - 50cm
🔗 Related Products
Model Loading Capacity Height Adjustment Max. Loading
1107 V-Head1/8"-12" Pipe28"-52" (71-132CM)2500LBS (1134Kgs)
1107C V-Head1/8"-12" Pipe20"-36 1/2" (50.5-93.5CM)2500LBS (1134Kgs)
1107B V-Head1/8"-12" Pipe23 1/2"-42 1/2" (60-108CM)2500LBS (1134Kgs)
1107-SB V-Head1/8"-12" Pipe28"-52" (71-132CM)1000LBS (454Kgs)
1107-DB V-Head1/8"-12" Pipe28"-52" (71-132CM)1500LBS (680Kgs)
1109 Roller-Head1/2"-12" Pipe32"-55" (82-140CM)2500LBS (1134Kgs)
🛠 Our Services
  • OEM Manufacturing support: Product design and customized packaging.
  • Sample orders are available for quality testing.
  • Professional inquiry response within 24 hours.
  • Lifetime free technical support and operation videos.
  • Continuous and stable supply of spare parts.
  • Comprehensive after-sales problem-solving and support.
Service Excellence
❓ Frequently Asked Questions
What are the available payment terms?
Generally, we require T/T 100% in advance or T/T 50% as a deposit, with the remaining 50% paid before shipment. Other terms may be considered based on order volume.
What are your delivery terms?
We support various delivery terms including EXW, FOB, CFR, and CIF to meet our clients' logistical needs.
How long is the standard delivery time?
Delivery typically takes 10-30 days after receiving the advance payment. The exact timeline depends on the specific items and total quantity of your order.
How are the products packaged for shipping?
Products are generally packed in sturdy cartons. Pallets can be provided upon request to ensure maximum safety during transit.
Do you offer OEM services?
Yes. If you provide samples or technical drawings, we can develop molds and manufacture products according to your specific requirements.
How do you ensure product quality?
We maintain strict quality control by testing 10% of the bulk production before every delivery to ensure high standards.
Welcome to purchase!

Related Products